Client: JSC "Siblitmash" (2010)
Works: Development of design and engineering documentation for tubings 7.0-30, 7.0-60, 7.0-80, 7.0-100 of the skip shaft in the mine of Gremyachinsky Mining and Processing Combined Works, JSC "EuroChim-VolgaKali" with the purpose of putting them in production, acceptance of tubings. Client:
JSC "EuroChim-VolgaKali" (2010, 2011, 2013) Works:
Development of design and engineering documentation for shaft tubings in the mine of Gremyachinsky Mining and Processing Combined Works, JSC "EuroChim-VolgaKali" with the purpose of putting them in production, acceptance of tubings. Client:
JSC "EuroChim-VolgaKali" (2010-2013) Works:
Development of process procedures for sinking of cage and skip shafts in the mine of Gremyachinsky Mining and Processing Combined Works (for passing the industrial safety expert review).
Favourable conclusions of the industrial safety expert review were approved by Rostechnadzor of Russia, letter No. 07-02-04/2959 dated 28.07.2010 for the cage shaft and letter No. 07-02-04/2960 dated 28.07.2010 for the skip shaft.
Client: JSC "EuroChim-VolgaKali" (2011)
Works: - 1. Design of sinking and construction works for skip shaft No. 2 (project documentation).
- 2. Design of sinking and construction works for skip shaft No. 2 (working and design documentation).
- 3. Development of process procedures for drilling freezing holes and rock freezing for sinking skip shaft No. 2 in the mine of Gremyachinsky Mining and Processing Combined Works (for passing the industrial safety expert review).
- 4. Development of process procedures for sinking of skip shaft No. 2 in the mine of Gremyachinsky Mining and Processing Combined Works (for passing the industrial safety expert review).
Client: JSC "EuroChim-VolgaKali" (2010)
Works: Field development audit of construction of the skip shaft equipment.
Client: JSC "EuroChim-VolgaKali" (2010-2013)
Works:
1. Design works of sinking and construction of three vertical shafts - two skip shafts and one cage shaft (project, working and design documentation). Shaft sinking is performed by freezing down to the elevation of minus 820 meters and making water seals of polymer materials.
- 2. Project works for shaft top and underground works of the mine.