Map of activities in the Russian Federation

CENTRAL
FEDERAL DISTRICT
SOUSERN
FEDERAL DISTRICT
URAL
FEDERAL DISTRICT
SIBERIAN
FEDERAL DISTRICT
FAR EASTERN
FEDERAL DISTRICT
Client: JSC "Yakovlevsky Mining and Processing Combined Works"
(2018-2019)

Works: Mechanical sinking of underground workings are under way
Map of activities in the Russian Federation
Central
federal district
Map of activities in the Russian Federation
Southern
federal district
Client:
JSC "EuroChim-VolgaKali"
(2010-2013)

Works:
Development of process procedures for sinking of cage and skip shafts in the mine of Gremyachinsky Mining and Processing Combined Works (for passing the industrial safety expert review).

Favourable conclusions of the industrial safety expert review were approved by Rostechnadzor of Russia, letter No. 07-02-04/2959 dated 28.07.2010 for the cage shaft and letter No. 07-02-04/2960 dated 28.07.2010 for the skip shaft.

Client:
JSC "EuroChim-VolgaKali"
(2010-2013)

Works:
1. Design works of sinking and construction of three vertical shafts - two skip shafts and one cage shaft (project, working and design documentation). Shaft sinking is performed by freezing down to the elevation of minus 820 meters and making water seals of polymer materials.

2. Project works for shaft top and underground works of the mine.
Client:
JSC "EuroChim-VolgaKali"
(2010)

Works:
Field development audit of construction of the skip shaft equipment.
Client:
JSC "Siblitmash"
(2010)

Works:
Development of design and engineering documentation for tubings 7.0-30, 7.0-60, 7.0-80, 7.0-100 of the skip shaft in the mine of Gremyachinsky Mining and Processing Combined Works, JSC "EuroChim-VolgaKali" with the purpose of putting them in production, acceptance of tubings.
Client:
JSC "EuroChim-VolgaKali"
(2011)

Works
1. Design of sinking and construction works for skip shaft No. 2 (project documentation).

2. Design of sinking and construction works for skip shaft No. 2 (working and design documentation).

3. Development of process procedures for drilling freezing holes and rock freezing for sinking skip shaft No. 2 in the mine of Gremyachinsky Mining and Processing Combined Works (for passing the industrial safety expert review).

4. Development of process procedures for sinking of skip shaft No. 2 in the mine of Gremyachinsky Mining and Processing Combined Works (for passing the industrial safety expert review).
Client:
JSC "EuroChim-VolgaKali"
(2010, 2011, 2013)

Works:
Development of design and engineering documentation for shaft tubings in the mine of Gremyachinsky Mining and Processing Combined Works, JSC "EuroChim-VolgaKali" with the purpose of putting them in production, acceptance of tubings.

Client:
"Verkhnekamsk Potash Company'"
(JSC "ACRON")
(2013-2019)

Works:
Freezing of formations to the depth of 300 m for sinking vertical shafts.
Map of activities in the Russian Federation
Ural
federal district
Client:
FSUE "Construction
management No. 30"

(2011)

Works:
Project works (project and working documentation) for drilling freezing holes and rock freezing (for specific sinking of the cage and skip shafts at the Talitsky area of the Verkhnekamskoye potash salts field.
Client: PJSC "Uralkali" (2017)

Works:
Development of project documentation sections and parts for "Southern mine SKRU-1. Stage 1. Construction of vertical shafts".
Client:
Thyssen Schachtbau Gmbh (Germany)
(2013)

Works:
Development of project documentation for sinking vertical shafts for the facility of JSC "Uralkali". Mine of Polovodsky Kali Complex Cage and skip shafts. Sinking and construction".
Client:
JSC "Galurgii"
(2012)

Works:
Development of project and working documentation "Inspection shaft wells on the site of shafts in the Polovodsky area of the Verkhnekamskoye potash salts field.
Client: Thyssen Schachtbau Gmbh (Germany) (2010) For the Branch of JSC "Kovdorskiy GOK" in Usolye

Works:
Project works (project and working documentation) for drilling freezing holes and rock freezing (for specific sinking of the cage and skip shafts at the Palashersky area of the Verkhnekamskoye potash salts field.
Client:
JSC "Institute Gipronickel"
(2018)

Works: Development of main design solutions and work documentation for the facility: "Upgrade of ВС-5 lining sections. Stage 1" of Taymyrsky mine.
Map of activities in the Russian Federation
Siberian
federal district
Client:
JSC"Institute Gipronickel"
(2011)

Works: Project works (work documentation) for loading skips with installation of landers in Skalistaya shaft of Komsomolsky mine in JSC MMC " Norilsk Nickel " Transpolar Branch.

Works: Project works (work documentation) for repair of central ore chute "north" CC-2 of Oktyabrsky mine in JSC MMC "Norilsk Nickel" Transpolar Branch.

Client: JSC "Poluys Project"
("Poluys Zoloto")
(2013)

Works: Feasibility studies of deep layer development in the Olimpiadninsky gold ore field. Justification of engineering solutions concerning the underground mine.
Заказчик: Тиссен Шахтбау ГмбХ (Германия) (2010)

Работы: Проходка технологического отхода до отм. -150 м. ствола ВС-10 рудника «Скалистый» ЗФ ОАО «ГМК «Норильский никель».
Client: JSC MMC "Norilsk Nickel" Transpolar Branch (2010)

Works:
- Construction of headgear facilities at Oktyabrsky, Taimyrsky and Skalisty mines.

-Integrated surveys of vertical shafts

Client:
"Mezhegeyugol Coal Company"
(JSC "CC Mezhegeyugol")
(2014)

Works: Construction of coal production complex facilities.
Client: JSC "ALROSA"
(2013)

Works: Development of the work documentation for the facility: "Udachny Mine. Recovery of vertical service shaft lining".
Map of activities in the Russian Federation
Far eastern federal district
Client: JSC "ALROSA"
(2011-2018 )

Works: - Construction of a vertical service shaft of Internatsionalny underground mine.

- Sinking and lining of the breakthrough tunnel system of the vertical service shaft with cage and skip shafts at el. +85 m of Internatsionalny underground mine. Construction of the skip charging system of the vertical service shaft.

- Construction and installation works during construction and mechanization of cage and skip shaft transitions of +85 m horizon of Internatsionalny mine.
Client: JSC "ALROSA"
(2011-2018 )

Works: - Mining and installation works in main openings on +85 m horizon of Internatsionalny mine.

- Engineering survey for restoration of lining and reinforcement of the vertical service shaft in Udachny mine. Non-destructive inspection of lining condition and testing of samples from local areas. Selection of protective coating compounds (concrete mixes, protective coatings, waterproof coatings) with high adhesion to existing concrete and resistance to aggressive brines.
Client: JSC "ALROSA"
(2011)

Works:
- Implementation of the work project for vertical cage shaft equipment in Aikhal mine.

- Development of the emergency exit project during re-equipment of the vertical cage shaft equipment in Aikhal mine.

- Development of the emergency exit project during re-equipment of the vertical cage shaft equipment in Aikhal mine.
Map of activities in the Republic of Belarus

Map of activities in the Russian Federation
Client: "Slavkaliy"
(2017)

Works:
1. Development of the project and work documentation for the facility: "Construction of the mining and processing combined works with capacity of 1.1 to 2.0 mln tonnes per year of potassium chloride on the raw material base of the Nezhinsky area (eastern part) of Starobinskoye potash salt field. Mine. Preliminary period. Sinking of the skip (No. 1) and cage (No. 2) shafts"

2. Development of the project and work documentation for the facility: "Construction of the mining and processing combined works with capacity of 1.1 to 2.0 mln tonnes per year of potassium chloride on the raw material base of the Nezhinsky area (eastern part) of Starobinskoye potash salt field. Mine. Shaft top works and Mine. Underground works".

OUR WORK
CENTRAL FEDERAL DISTRICT
Client: JSC "Yakovlevsky Mining and Processing Combined Works" (2018-2019)
Works: Mechanical sinking of underground workings are under way
SOUSERN FEDERAL DISTRICT
Client: JSC "Siblitmash" (2010)
Works:
Development of design and engineering documentation for tubings 7.0-30, 7.0-60, 7.0-80, 7.0-100 of the skip shaft in the mine of Gremyachinsky Mining and Processing Combined Works, JSC "EuroChim-VolgaKali" with the purpose of putting them in production, acceptance of tubings. Client:
JSC "EuroChim-VolgaKali" (2010, 2011, 2013) Works:
Development of design and engineering documentation for shaft tubings in the mine of Gremyachinsky Mining and Processing Combined Works, JSC "EuroChim-VolgaKali" with the purpose of putting them in production, acceptance of tubings. Client:
JSC "EuroChim-VolgaKali" (2010-2013) Works:
Development of process procedures for sinking of cage and skip shafts in the mine of Gremyachinsky Mining and Processing Combined Works (for passing the industrial safety expert review).
Favourable conclusions of the industrial safety expert review were approved by Rostechnadzor of Russia, letter No. 07-02-04/2959 dated 28.07.2010 for the cage shaft and letter No. 07-02-04/2960 dated 28.07.2010 for the skip shaft.

Client: JSC "EuroChim-VolgaKali" (2011)
Works:
  • 1. Design of sinking and construction works for skip shaft No. 2 (project documentation).
  • 2. Design of sinking and construction works for skip shaft No. 2 (working and design documentation).
  • 3. Development of process procedures for drilling freezing holes and rock freezing for sinking skip shaft No. 2 in the mine of Gremyachinsky Mining and Processing Combined Works (for passing the industrial safety expert review).
  • 4. Development of process procedures for sinking of skip shaft No. 2 in the mine of Gremyachinsky Mining and Processing Combined Works (for passing the industrial safety expert review).

Client: JSC "EuroChim-VolgaKali" (2010)
Works: Field development audit of construction of the skip shaft equipment.

Client: JSC "EuroChim-VolgaKali" (2010-2013)
Works:
1. Design works of sinking and construction of three vertical shafts - two skip shafts and one cage shaft (project, working and design documentation). Shaft sinking is performed by freezing down to the elevation of minus 820 meters and making water seals of polymer materials.
  • 2. Project works for shaft top and underground works of the mine.
URAL FEDERAL DISTRICT
Client: Thyssen Schachtbau Gmbh (Germany) (2013)
Works:
Development of project documentation for sinking vertical shafts for the facility of JSC "Uralkali". Mine of Polovodsky Kali Complex Cage and skip shafts. Sinking and construction".

Client: JSC "Galurgii" (2012)
Works:
Development of project and working documentation "Inspection shaft wells on the site of shafts in the Polovodsky area of the Verkhnekamskoye potash salts field. Client: PJSC "Uralkali" (2017)

Works:
Development of project documentation sections and parts for "Southern mine SKRU-1. Stage 1. Construction of vertical shafts".

Client: "Verkhnekamsk Potash Company'" (JSC "ACRON") (2013-2019)
Works:
Freezing of formations to the depth of 300 m for sinking vertical shafts. Client:
FSUE "Construction management No. 30" (2011)
Works:
Project works (project and working documentation) for drilling freezing holes and rock freezing (for specific sinking of the cage and skip shafts at the Talitsky area of the Verkhnekamskoye potash salts field. Client: Thyssen Schachtbau Gmbh (Germany) (2010) For the Branch of JSC "Kovdorskiy GOK" in Usolye
Works:
Project works (project and working documentation) for drilling freezing holes and rock freezing (for specific sinking of the cage and skip shafts at the Palashersky area of the Verkhnekamskoye potash salts field.
SIBERIAN FEDERAL DISTRICT
Client: JSC "Institute Gipronickel" (2018)
Works:
Development of main design solutions and work documentation for the facility: "Upgrade of ВС-5 lining sections. Stage 1" of Taymyrsky mine.

Client: JSC MMC "Norilsk Nickel " Transpolar Branch (2010)
Works:
- Construction of headgear facilities at Oktyabrsky, Taimyrsky and Skalisty mines.
-Integrated surveys of vertical shafts.

Client: JSC"Institute Gipronickel" (2011)
Works:
Project works (work documentation) for loading skips with installation of landers in Skalistaya shaft of Komsomolsky mine in JSC MMC " Norilsk Nickel " Transpolar Branch.

Works: Project works (work documentation) for repair of central ore chute "north" CC-2 of Oktyabrsky mine in JSC MMC "Norilsk Nickel" Transpolar Branch. Client: Thyssen Schachtbau Gmbh (Germany) (2010) Works: Sinking the process allotment down to elevation of -150 m in ВС-10 shaft of Skalisty mine in JSC MMC "Norilsk Nickel" Transpolar Branch. Client: JSC "Poluys Project" ("Poluys Zoloto") (2013) Works: Feasibility studies of deep layer development in the Olimpiadninsky gold ore field. Justification of engineering solutions concerning the underground mine.

Client: "Mezhegeyugol Coal Company" (JSC "CC Mezhegeyugol") (2014)
Works:
Construction of coal production complex facilities.
FAR EASTERN FEDERAL DISTRICT
Client: JSC "ALROSA" (2011)
Works:
  • Implementation of the work project for vertical cage shaft equipment in Aikhal mine. - Development of the emergency exit project during re-equipment of the vertical cage shaft equipment in Aikhal mine.
  • Development of the emergency exit project during re-equipment of the vertical cage shaft equipment in Aikhal mine.

Client: JSC "ALROSA" (2013)
Works: Development of the work documentation for the facility: "Udachny Mine. Recovery of vertical service shaft lining".

Client: JSC "ALROSA" (2011-2018)
Works:
  • - Construction of a vertical service shaft of Internatsionalny underground mine.
  • - Sinking and lining of the breakthrough tunnel system of the vertical service shaft with cage and skip shafts at el. +85 m of Internatsionalny underground mine. Construction of the skip charging system of the vertical service shaft.
  • - Construction and installation works during construction and mechanization of cage and skip shaft transitions of +85 m horizon of Internatsionalny mine.

Client: JSC "ALROSA" (2011-2018)
Works: - Mining and installation works in main openings on +85 m horizon of Internatsionalny mine.

- Engineering survey for restoration of lining and reinforcement of the vertical service shaft in Udachny mine. Non-destructive inspection of lining condition and testing of samples from local areas. Selection of protective coating compounds (concrete mixes, protective coatings, waterproof coatings) with high adhesion to existing concrete and resistance to aggressive brines.
REPUBLIC OF BELARUS
Client: "Slavkaliy" (2017)
Works:
1. Development of the project and work documentation for the facility: "Construction of the mining and processing combined works with capacity of 1.1 to 2.0 mln tonnes per year of potassium chloride on the raw material base of the Nezhinsky area (eastern part) of Starobinskoye potash salt field. Mine. Preliminary period. Sinking of the skip (No. 1) and cage (No. 2) shafts"
2. Development of the project and work documentation for the facility: "Construction of the mining and processing combined works with capacity of 1.1 to 2.0 mln tonnes per year of potassium chloride on the raw material base of the Nezhinsky area (eastern part) of Starobinskoye potash salt field. Mine. Shaft top works and Mine. Underground works".